Actual Week 11

 That last post was Blake's fault he decided to be a dork and write that.This week, we continued daily journal along with the proposal and  presentation. Our group has also been discussing on how we are going to present in January to our peers. Since it is a month away we have time to collaborate and get write down ideas for the presentation.

Week 11

This week, we continuedQSWZEWDXEXREXFCDZEST5GFCRXEDSW5FCXRDESWT5GVRFCXEDSWGVRFCXEDSWZAily journal along with the proposal and  presentation. Our group has also een discussing on how we are going to present in January to our peers. Since it is a month away we have time to collaborate and get write down ideas for the presentation.
atie would like to put a quote that has little to do with bridges and more with death. "I crash my car into a bridge I DONT CARE I LUV IT"

Friday, November 22, 2013

WEEK 10

This week we worked on starting our bridge proposal paper. The proposal is a paper that shows your whole entire project written out on paper. This usually includes sketches, data, graphs,statistics, daily journal, etc. This week we also worked on building our bridge prototypes. The prototypes should be done and ready to test within the next three to four weeks.

Friday, November 15, 2013

Week 9

This week we continued to work on building our prototypes. We also learned that Blake and I can not open locked doors. We both spent at least 20 minutes trying to open a door, that was locked, with Spiece's keys, which is probably about 50 keys. We also started our daily journal that is required for entering the competition. Lastly we started putting the charts we made a few weeks ago into the power point and the proposal.

Friday, November 8, 2013

Week 8

This week we have started our daily journal for the MDOT bridge competition. This requires us to record or comments everyday until the competition in a document attached to our paper. Since we only meet on Fridays we will have to either work at home or stay after school. we have also started our proposal for the competition.

Friday, November 1, 2013

WEEK 7
 This week we worked on building the prototypes for our bridge. The prototypes are built with balsa wood and glue. We also finished up some last minute sketches. We also did the little piece of paper that Mr. Odinga had us fill out. We also took the test online today as well.

Friday, October 25, 2013

Week 6

This week, we have drawn sketches of the truss designs and we have been prototyping ton figure out which truss design we are going to use. Blake is going to draw and build the Warren truss design.

Katie is going to draw and build the Baltimore truss design.
Sierra is going to draw and create the Pratt truss design.
We will use these prototypes to figure out of which one is the best choice.